Skip Navigation

Digital Archive Ontario

Current and historical content, curated by Toronto Public Library

Waterfront bridge starts work. A $1;000;000 shortcut for truck traffic to the waterfront industrial area south of the Keating Channel; this new lift bridge on Cherry St. will start operating this week. The smal; high-rise booth on the right of bridge is the operator's cabin. Open in full size

Waterfront bridge starts work. A $1;000;000 shortcut for truck traffic to the waterfront industrial area south of the Keating Channel; this new lift bridge on Cherry St. will start operating this week. The smal; high-rise booth on the right of bridge is the operator's cabin.

Picture, 1968, English

Waterfront bridge starts work. A $1;000;000 shortcut for truck traffic to the waterfront industrial area south of the Keating Channel; this new lift bridge on Cherry St. will start operating this week. The smal; high-rise booth on the right of bridge is the operator's cabin.

Picture, 1968, English

Rights and Licenses

Toronto Star License

Provenance

From the Toronto Star Archives

File Location:

Canada - Ontario - Toronto - Bridges - Miscellaneous

Branch

Toronto Reference Library

Location

Baldwin Collection

Branch

Toronto Reference Library

Location

Toronto Star Photo Archive

Call Number / Accession Number

tspa_0109651f