Workers inspecting blast furnace cone at the Dominion Bridge Co. Ltd. steel fabrication plant Open in full size

Workers inspecting blast furnace cone at the Dominion Bridge Co. Ltd. steel fabrication plant

Picture, 1976, English

Workers inspecting blast furnace cone at the Dominion Bridge Co. Ltd. steel fabrication plant

Picture, 1976, English

Caption:

Workers at the Dominion Bridge Co. Ltd. steel fabrication plant inspect the top cone for the Number 1 blast furnace now under construction at the Steel Co. of Canada's massive Nanticoke project on the north shore of Lake Erie. The $1.25 billion project is scheduled to come on stream in early 1980 and will provide 1.3 million tons of slab steel annually. A mixture of iron ore, coke and flux pours through top cone into furnace, where it is super-heated into molton iron. The total cost of the Nanticoke complex has more than doubled since it was announced in late 1973.

Publisher

Toronto Star

Rights and Licenses

Toronto Star License

Provenance

From the Toronto Star Archives

File Location:

G2--Canada-Ontario-Nanticoke-126b-GO-208

Branch

Toronto Reference Library

Location

Baldwin Collection

Branch

Toronto Reference Library

Location

Toronto Star Photo Archive

Call Number / Accession Number

TS-2-126-GO-208